Shadow Transport Inc.’s project in Financial District included placement of (1) chiller into the cellar level.

Shadow’s scope included:

Engineered Drawings for rig
Storage of equipment at Shadow Facility
Transportation of equipment to jobsite
Crane rental
Hoisting equipment down exterior elevator shaft to cellar level
Break down of crane
Clean up of jobsite