Shadow Transport Inc.’s involvement in the 295 5th Ave.

Shadow’s scope included:

Engineered Drawings for rig
Storage of equipment at Shadow Facility
Transportation of equipment to jobsite
Crane rental
Hoisting & placing equipment on designated roof
Disassemble of crane
Clean up of jobsite